>成套设备>变电站>SAI-3881D发电机保护测控装置加.. 免费发布变电站信息
广告
热门浏览

SAI-3881D发电机保护测控装置加工 欢迎来电洽谈

更新时间:2021-10-25 10:30:04 信息编号:7a28gm38o018f1
SAI-3881D发电机保护测控装置加工 欢迎来电洽谈
  • 面议

  • 南瑞

  • SAI-3881D发电机保护测控装置加工

18664907778 13302929585

2880125177

分享

详情介绍

产品别名
发电机保护测控装置
面向地区

SAI-3881D发电机保护测控装置加工 欢迎来电洽谈

AC measurement
A group of three-phase current, three-phase voltage and zero sequence voltage, power, frequency, power, power factor
Switch input
11 way switch input, can be the whole set of non electric power for "trip" or "alarm", the first 4 non electricity can be arbitrarily set trip exit
Switch output
8 way switch contact output, the 4 switch jump closing control
control loop
Jump control circuit, circuit breaker hand jump, hand closing operation and hop position indication
1.3 function configurationFunction configuration of SAI3880D digital generator differential protection deviceDifferential quick break, ratio brake differential, CT disconnection locking differential, CT disconnection alarm, stator overvoltage protection, stator ground fault protection, overload alarm, anti time overcurrent protectionFunction configuration of backup protection device for SAI3881D digital generatorTransverse differential protection, loss of excitation protection, rotor one point grounding protection, rotor two points grounding protection composite voltage over current protection, inverse time negative sequence overcurrent protection, Pt disconnection alarm, non electricity protection (generator water shutoff, and the generator thermal, generator excitation accident, main steam valve closed),
SAI-3881D发电机保护测控装置加工
Two technical parameter
2.1 Rated parameters
2.1.1Rated DC voltage: 220V or 110V (order indicated)
2.1.2 Rated AC data:
a) Phase voltage V
1)the maximum phase current of a side is less than 20% of the rated current, it is not sentenced to the side;
2)2) the maximum value of the phase current is greater than 120% of the rated current of the side;
3)3) served as the start of one side of the current than before the start of the increase.In the case of the above three conditions are not satisfied, such as one side at the same time meet the following conditions, then sentenced to CT break:
1)only one phase current is zero;
2) the remaining two phase currents are equal before starting the current.
3.3.2 differential current limit alarmIf the difference is greater than 15% of the rated current, after more than 10s discriminant, issued a warning signal. Differential current limit, but not locked differential protection. The function and the monitoring function of the AC sampling circuit of the protection device
3.4 loss of magnetic protection
Generator loss of excitation protection for generator excitation current abnormal decrease or disappear completely lost magnetic fault protection, by the generator stator impedance as the main criterion, combined with low voltage and generator excitation system low voltage as auxiliary criterion, and have TV disconnection locking function, TV break send alarm signal.
Its action logic is as follows:
3.10 stator overvoltage protection
For generator, in particular to a hydro generator, after load rejection due to the speed control of speed control system can not keep up, is easy to appear the stator voltage exceeds the allowed range of over voltage phenomena; at this point to be equipped with over voltage protection, protection from the generator terminal voltage when any phase of more than setting value by setting the delay action to stop.
3.11 stator ground protection
Generator stator grounding protection can for the generator neutral point ungrounded or via arc suppression coil grounding grounding, protection from the generator end opening of the delta winding voltage when open delta windings voltage greater than setting value by setting the exit delay.
1)under the time limit: when the three-phase current is greater than the lower limit of the value of any phase, but not meet the anti time limit start value, press the lower limit delay action on the alarm signal;
2) inverse time: when the three-phase current any phase current is larger than the inverse time starting value, according to the inverse time lag action equation I2-1 t is greater than or equal to K acts, type: I for the generator current standard? Value, K - generator stator winding allows thermal time constant.
3) the upper bound limit: when the three-phase current is greater than the upper limit value, the time limit is delayed by the time limit.
3.8 transverse differential protection
Generator transverse differential protection is usually used for the reaction of generator stator winding inter turn short circuit and a parallel windings open welding, protection from the generator neutral point between two branch imbalance fundamental current, but current is greater than fixed value setting delay action on the alarm or trip.

-/gjigcb/-

深圳国网南瑞科技有限公司 5年

  • 智慧配电房,微机保护,微机五防,智能光伏测控
  • 鹏益花园4栋808室

———— 认证资质 ————

没有个人认证
企业认证已通过
天眼查已核实
手机认证已通过
微信认证已通过

最近来访记录

  • 北京朝阳网友用iPhone手机一个月前在百度APP访问了本页
  • 北京丰台网友用iPhone手机一个月前在百度APP访问了本页
  • 北京朝阳网友用iPhone手机一个月前在百度APP访问了本页
  • 北京丰台网友用iPhone手机一个月前在百度APP访问了本页
  • 北京朝阳网友用iPhone手机一个月前在百度APP访问了本页

相关推荐产品

留言板

  • 发电机保护测控装置SAI-3881D发电机保护测控装置加工
  • 价格商品详情商品参数其它
  • 提交留言即代表同意更多商家联系我
深圳国网南瑞科技有限公司为你提供的“SAI-3881D发电机保护测控装置加工 欢迎来电洽谈”详细介绍,包括SAI-3881D发电机保护测控装置加工价格、型号、图片、厂家等信息。如有需要,请拨打电话:18664907778。不是你想要的产品?点击发布采购需求,让供应商主动联系你。
“SAI-3881D发电机保护测控装置加工 欢迎来电洽谈”信息由发布人自行提供,其真实性、合法性由发布人负责。交易汇款需谨慎,请注意调查核实。